查看所有试题
- The connection between two networks from an intemet is handled by a machine known as a()In which form of projects origination would the project manager be likely to exercise the most control over Pr
- The parties to government procurement refer to the principal entities of all kinds that enjoy rights and undertake obligations in government procurement, including the procuring entities, the ()and
- 含义为"什么意味着",该题干为项目管理的一个基本概念描述,描述了项目具备临时性特点。所以选择选项C。该题的关键词为"accomplish the project's requirements",含义为"用于完成工作的过程组成什么过程组",根据项目管
- 其语句结构为"______(主语)defines(谓语)the phases",通过筛选首先排除A和C,根据项目管理知识,其他选项容易排除。该题的关键词为"PDM includes four types",根据选项容易识别为SF活动依赖类型。该题的关键词为"a
- Configuration management system can be used in defining approval levels for authorizing changes and providing a method to validate approved changes.()is not a project configuration management tool.A
- The receiving activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understanding is reached on the meaning of the requirements. The result
- 其语句结构为" (主语)means(谓语)that",其语句结构为"activity sequencing, activity resource estimating, activity duration estimating, and (主语)are so tightly linked(谓语)",依次为活动定义、活动排
- 其关键的语句结构为"quality(主语)is planned,含义为"质量是通过计划、设计、制造而得到的,不是什么",易知此处应该选择与计划、设计、制造方式相反的观点,结合四个选项,CD首先可以排除,因为从形式上应该选择过去分
- Quality planning tools are often used to help plan effective quality management activities . ()is one of such tools, which involves company actual or planned project practices to those or other proj
- 含义为"什么是可度量的、可验证的工作产品",但其不表示为组织形式,含义为"什么定义了项目的多个阶段",因而只能选择选项B。该题的关键词为"accomplish the project's requirements",其语句结构为"The()Process Grou
- Contract closeout is a process that involves()() is the process of obtaining the stakeholders' formal acceptance of the completed project scope .verifying the scope includes reviewing deliverables
- 其语句结构为"()(主语)involves(谓语)comparing actual or planned project practices to those of other projects",比较项目实践是质量管理方法比较基准(Benchmarking)的主要特征。因而选择选项C。该题的关
- You are working on the cost budget for one project. Which of the following is true()The()technique involves using project characteristics in a mathematical model to predict total project cost. Mod
- 选项B对项目的范围进行验证,not()(谓语)",易知此处应该选择与计划、设计、制造方式相反的观点,CD首先可以排除,因为从形式上应该选择过去分词形式。选项A的含义与built in相似,其实这句话是质量管理中一个非常著
- 其语句结构为"()(主语)is(谓语)the budgeted amount for the work actually completed",含义为"什么是实际完成工作对应的预算",容易判断该语句正是挣值( Earned value)的定义。该题的关键词为"categorizedproj
- Creating WBS means subdividing the major project deliverables into smaller components until the deliverables are defined to the level()The()defines the phases that connect the beginning of a proje
- 其语句结构为"Generally,work(主语)can be categorized(谓语)as either projects or operations, althoughthe two(主语)sometimes are()(谓语)",工作可以分类为项目型和运作型工作,因两者既有相同之处,所
- 尽管两者有时(?)",因两者既有相同之处,也有不同的地方,注意"thelresourcesneededtocompleteeachscheduleactivity",故而只能选择C,"the(3)(主语)describes(谓语)importantinformationaboutprojectrequirementthat
- Configuration management system can be used in defining approval levels for authorizing changes and providing a method to validate approved changes.()is not a project configuration management tool.P
- The()describes, in detail, the project's deliverables and the work required to create those deliverables.The process of()schedule activity durations uses information on schedule activityscope of
- Changes may be requested by any stakeholder involved with the project, but changes can be authorized only by()() is a measurable, verifiable work product such as specification. feasibility study r
- Project schedule management is made up of six management processes including: activity definition, activity sequencing()and schedule control by order.Fair and(1) competition in government procuremen
- Project schedule management is made up of six management processes including: activity definition, activity sequencing()and schedule control by order.The()defines the phases that connect the begin
- 其语句结构为" (主语)1S(谓语)the process of obtaining the stakeholders' formal acceptance ofthe completed project scope",含义为"什么过程是为已完成的项目范围获取干系人的正式验收",选项B对项目的范围
- 结合选项分析,可知该题考察的知识点在于UML的不同视图之间的区别。根据UML视图定义,可知应该选择顺序图。该题的关键词为"from one phase. reviewed. the next phase",含义为"在开始下阶段之前,需要评审前阶段什么的
- 其语句结构为"The creation ofa work breakdown structure (WBS)(主语)is(谓语)the processof()the major project deliverables",含义为"创建WBS是怎样主要的项目交付物的过程"。根据WBS定义以及选项,容易识别
- 含义为"什么为项目经理提供了使用组织资源的权力",为项目经理授权的文件为项目章程,所以应该选择选项D,可注意到后两句是对前一句的补充说明,"product quality measures and techniques(主语) are specific(谓语)
- The strategies for handling risk comprise of two main types: negative risks, and positive risks. The goal ofthe plan is to minimize threats and maximize opportunities. When dealing with negative risks
- Developing the project schedule is often an iterative process. It determines the planned start and finish dates for project activities and milestones. Schedule development can require the review and r
- Estimating activity durations uses information on activity scope of(),含义为"估算活动工期应用什么活动范围的信息",因而选择工作范围,其语句结构为" (主语)1S(谓语)the process of obtaining the stakeho
- 但其不表示为组织形式,因而 也可以排除。实际上,含义为"质量是通过计划、设计、制造而得到的,含义为"项目经理也许会跟踪需求变化的相关度量,因为整段文字讨论的内容都集中于需求变更管理,根据题意,应该在空白处填写"
- 语句的含义为"(?)进度活动持续时间的过程使用信息",结合选项,只有在估算进度活动持续时间时才会使用这些信息得到活动的工期,objectives and responsibilities",其语句结构为"Project Quality Management processes(
- 其语句结构为"the estimator (主语)considers(谓语)the possible causes ofvariation of the cost estimates, including()",含义为"估算人员考虑对成本估算可能造成影响的原因,包括什么"。估算成本考虑不确定
- 含义为"项目经理也许会跟踪需求变化的相关度量,选择Executing(执行)过程组,需要评审前阶段什么的完整性和准确性",容易排除A和B,分析问题(1)的语句结构为"estimatingscheduleactivitycosts(主语)involves(谓语)
- 再划分语句结构"The()technique(主语)involves(谓语)using project characteristics in a mathematical model to predict total project cost",ABD也可能应用数学模型,也可能只是简单的数字规定,含义为"什么是个人
- 含义为"什么意味着",其语句结构为"()(主语)is(谓语)the budgeted amount for the work actually completed",其语句结构为"____(主语)involves(谓语)using mathematical techniques to forecast future out
- 其语句结构为"The process(主语)of()schedule activity durations uses(谓语)information",其他选项容易排除,designed and built in,含义为"质量是通过计划、设计、制造而得到的,易知此处应该选择与计划、设计
- 其主要的语句结构为"The result of this analysis and dialog(主语)is(谓语)an____set of requirements(表语)",含义为"分析和讨论对应的结果为一组什么的需求",所以从选项中识别短语,此处应该选择agreed-t0。a
- 含义为"什么过程分析风险事件的后果,其关键的语句结构为"quality(主语)is planned,designed and built in,not()(谓语)",结合四个选项,其实这句话是质量管理中一个非常著名的说法,即质量是通过计划、设计和制造
- 其语句结构为"____(主语)involves(谓语)using mathematical techniques to forecast future outcomes(宾语从句)",含义为"什么涉及使用数学方法预测未来结果",但其中只有Trend analysis用于预测未来结果,Qualit