• [单选题]Organizations perform work to achieve a set of objectives. Generally, work can be categorized as either projects or operations, although the two sometimes are()
  • 正确答案 :C
  • overlap

  • 解析:该题的关键词为"categorizedprojects or operations",其语句结构为"Generally,work(主语)can be categorized(谓语)as either projects or operations, althoughthe two(主语)sometimes are()(谓语)",含义为"通常,工作可以分类为项目型和运作型工作,尽管两者有时(?)",因两者既有相同之处,也有不同的地方,所以选择C。选项D对应的单词"dissever"疑为拼写有误。

  • [单选题]During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised()are necessary.
  • 正确答案 :B
  • controls

  • 解析:该题的关键词为"appropriate measures、 requirements volatility",其语句结构为"The project manager(主{吾) may, however, want to track(谓{吾) appropriate measures of requirements volatility(宾语) to judge whether new or revised()are necessary(目的状语从句)",含义为"项目经理也许会跟踪需求变化的相关度量,以判断是否应该调整的或者新的什么",因为整段文字讨论的内容都集中于需求变更管理,所以只分析最后一句即可,根据题意,应该在空白处填写"措施"一类的词汇,排除之后只有选项B比较适合,选项A、C和D都可以排除,尤其是选项D是一个很生僻的词汇,含义为"尝试"。

  • [单选题]The creation ofa work breakdown structure (WBS) is the process of()the major project deliverables.
  • 正确答案 :A
  • subdividing

  • 解析:该题的关键词为"work breakdown structure、 major project deliverables",其语句结构为"The creation ofa work breakdown structure (WBS)(主语)is(谓语)the processof()the major project deliverables",含义为"创建WBS是怎样主要的项目交付物的过程"。根据WBS定义以及选项,容易识别出应选择分解(subdividing)

  • [单选题]You are working on the cost budget for one project. Which of the following is true()
  • 正确答案 :B
  • The cost baseline will be used to measure variances and future project performance.


  • [单选题]Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.
  • 正确答案 :

  • 查看原题 查看所有试题


    推荐科目: 面向对象系统分析与设计题库 法律法规和标准规范题库 中级数据库系统工程师题库 初级信息处理技术员题库 项目风险管理题库 项目沟通管理题库 外包管理题库 需求管理题库 文档与配置管理题库 高级网络规划设计师题库
    @2019-2025 必典考网 www.51bdks.net 蜀ICP备2021000628号 川公网安备 51012202001360号