正确答案:

题目:Ravi, like many project (1) , had studied the waterfall model of software development as the primary software life-cycle (2) . He has all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as (4) . The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most situation, an existing process must be (5) to the new problem. A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.

解析:参考译文:和许多项目经理一样,Ravi研究了作为主要软件生命周期过程的瀑布模型。他打算在首个任务,也就是即将开始的项目中使用瀑布模型。但是,他发现瀑布模型不能满足要求,原因是客户希望软件分阶段交付,也就意味着系统必须一部分一部分地交付和构建,而不是作为一个整体进行。这种情况在很多其他项目中也类似。现实世界中,很难有一种标准的过程或在前期的项目中使用的过程作为目前项目的最佳选择。对于大部分情况,必须对已存在的过程进行调整,以适应新的问题。但是,即使经过调整,一个开发过程也很难处理变化的需求。为了适应变化的需求而不失去对项目的控制,你必须用需求变更管理过程从而对开发过程进行补充。

查看原题 查看所有试题

学习资料的答案和解析:

  • [单选题]下列属于计算机监控系统中“四遥”的是()。
  • 遥信、遥调;


  • [单选题]可促进人类IgE类别转换的是()
  • IL-4

  • 解析:1.IL-8对中性粒细胞有趋化作用。2.IL-4可促进Ig的类别转换,促进IgE的产生。3.Th1分泌的细胞因子IFN-γ可抑制Th0细胞向Th2细胞转化。

  • [单选题]抽样调查是指()。
  • 从总体中随机抽取有代表性的一部分进行调查


  • [多选题]下面哪些属于严重故障。()
  • 产品的容量降低(但仍然可以处理预期的负载)

    任何丧失产品管理和维护的可见度和/或诊断能力

    基本部件或功能的反复衰退


  • [单选题]病例摘要:患者,男性,25岁,腹泻与便秘交替2个月,伴午后低热。腹软,未扪及包块。PPD试验(+++)。B超提示腹腔积液。

  • 推荐下载科目: 程序语言基础知识题库 系统开发和运行题库 计算机系统基础知识题库 操作系统知识题库 标准化和软件知识产权基础知识题库 算法设计和分析题库 面向对象技术题库 数据结构题库 多媒体基础知识题库 网络基础知识题库
    @2019-2025 必典考网 www.51bdks.net 蜀ICP备2021000628号 川公网安备 51012202001360号