1. [单选题]The()describes, in detail, the project's deliverables and the work required to create those deliverables.

A. A


2. [单选题]()is a category assigned to products or services having the samefunctional use but different technical characteristics. Itisnotsameasquality.

A. Problem
B. Grade
C. Risk
D. Defect


3. [单选题]The project team members should also be aware of one of the fundamental tenets of modern quality management: quality is planned, designed and built in, not()

A. executedin
B. inspectedin
C. check-in
D. look-in


4. [单选题]Define Activities is the process ofidentifying the specific actions to be performed toproduce the()

A. projectelements
B. work drafts
C. workpackage
D. projectdeliverables


5. [单选题]Project work packages are typically decomposed into smaller components called activities to provide a basis for()scheduling, executing, and monitoring and controllingthe proj ect work.

A. reviewing
B. estimating
C. auditing
D. expecting


6. [单选题]Configuration management system can be used in defining approval levels for authorizing changes and providing a method to validate approved changes.()is not a project configuration management tool.

A. RationalClearcase
B. QualityFunctionDeployment
C. VisualSourceSafe
D. ConcurrentVersions System


7. [单选题]Project selection methods involve measuring value or attractiveness to the project owner or sponsor and may include other organizational decision criteria ()is not a project selection method.

A. Benefitcontribution
B. Expertjudgment
C. Scoringmodels
D. Flowcharting


8. [单选题]An example of scope verification is ().

A. review the performance ofan installed software module
B. managing changes to the project schedule
C. decomposing the WBS to a work package level
D. performing a benefit/cost analysis to determine if we should proceed with the project


9. [单选题](1) is a method of constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the dependencies.This method includes following types of dependencies or precedence relationships: (2) the initiation of the successor activity, depends upon the completion ofthe predecessor activity.(3) the initiation ofthe successor activity, depends upon the initiation ofthe predecessor activity.

A. A


10. [单选题]Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

A. D