必典考网

2022专业英语题库试题共用题干题解析(04.17)

来源: 必典考网    发布:2022-04-17     [手机版]    
  • 下载次数:
  • 支持语言:
  • 1129次
  • 中文简体
  • 文件类型:
  • 支持平台:
  • pdf文档
  • PC/手机

导读

必典考网发布2022专业英语题库试题共用题干题解析(04.17),更多专业英语题库的答案解析请访问必典考网高级信息系统项目管理师题库频道。

1. [单选题]The()defines the phases that connect the beginning of a project to its end.

A. schedule
B. project life cycle
C. temporary
D. milestone


2. [单选题]Estimating schedule activity costs involves developing an (1) of the cost of theresources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additionalwork during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of (2) to facilitate comparisons both within and across projects.the (3) describes important information about project requirement that is considered during cost estimating.

A. A


  • 查看答案&解析 查看所有试题

  • 本文链接:https://www.51bdks.net/show/ywk9xe.html

    @2019-2025 必典考网 www.51bdks.net 蜀ICP备2021000628号 川公网安备 51012202001360号