  • [单选题]The()Process Group consists of the processes used to complete the work defined in the project management plan to accomplish the project's requirements.

  • A. Planning
    B. Executing
    C. Monitoring and Controlling
    D. Closing

  • 查看答案&解析 查看所有试题
  • 学习资料:
  • [单选题]()involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance.These other projects can be within the performing organization or outside of it,and can be within the same or in another application area.
  • A. Metrics
    B. Measurement
    C. Benchmarking
    D. Baseline

  • [单选题]In approximating costs, the estimator considers the possible causes ofvariation of the cost estimates, including()
  • A. budget
    B. plan
    C. risk
    D. contract

  • [单选题]Project Quality Management must address the management of the project and the()ofthe project. While Project Quality Management applies to all projects,regardless of the nature of their product, product quality measures and techniques are specific to the particular type of product produced by the project.
  • A. performance
    B. process
    C. product
    D. object

  • [单选题]Project work packages are typically decomposed into smaller components called activities to provide a basis for()scheduling, executing, and monitoring and controllingthe proj ect work.
  • A. reviewing
    B. estimating
    C. auditing
    D. expecting

  • [单选题](1) is a method of constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the dependencies.This method includes following types of dependencies or precedence relationships: (2) the initiation of the successor activity, depends upon the completion ofthe predecessor activity.(3) the initiation ofthe successor activity, depends upon the initiation ofthe predecessor activity.
  • A. D

  • [单选题]Documentation of a software package is normally produced for two purposes. One is to explain the (1) ofthe software and describe how to use them. This is known as (2) because it is designed to be read by the user of the software. The other purpose of documentation is to describe the software's internal composition so that the system can be maintained later in its life cycle. Documentation ofthis type is known as ( 3 )
  • A. C

  • 本文链接:https://www.51bdks.net/show/yvzrk.html
  • 推荐阅读

    @2019-2025 必典考网 www.51bdks.net 蜀ICP备2021000628号 川公网安备 51012202001360号