必典考网

专业英语题库2022易混易错每日一练(08月20日)

来源: 必典考网    发布:2022-08-20     [手机版]    
  • 下载次数:
  • 支持语言:
  • 900次
  • 中文简体
  • 文件类型:
  • 支持平台:
  • pdf文档
  • PC/手机

导读

必典考网发布专业英语题库2022易混易错每日一练(08月20日),更多专业英语题库的每日一练请访问必典考网高级信息系统项目管理师题库频道。

1. [单选题]Define Activities is the process ofidentifying the specific actions to be performed toproduce the()

A. projectelements
B. work drafts
C. workpackage
D. projectdeliverables


2. [单选题]Many useful tools and techniques are used in developing schedule()is a schedule network analysis technique that modifies the project schedule to account for limited resource.

A. PERT
B. Resourceleveling
C. Schedulecompression
D. Critical chain method


3. [单选题]Configuration management system can be used in defining approval levels for authorizing changes and providing a method to validate approved changes.()is not a project configuration management tool.

A. RationalClearcase
B. QualityFunctionDeployment
C. VisualSourceSafe
D. ConcurrentVersions System


4. [单选题]An activity has an early start date-of the lOth and a late start date of the 19th. The activity also has a duration of 4 days. There are no nonworkdays. From the information given, ()what can be concluded about the activity?

A. A


5. [单选题]Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

A. A


  • 查看答案&解析 查看所有试题

  • 本文链接:https://www.51bdks.net/show/yo3kpn.html

    @2019-2025 必典考网 www.51bdks.net 蜀ICP备2021000628号 川公网安备 51012202001360号