【名词&注释】
必典考网发布"We have to point out that the postponement of the fulfilment"考试试题下载及答案,更多(二)单项选择题题库的考试试题下载及答案考试题库请访问必典考网外贸外语题库频道。
[单选题]We have to point out that the postponement of the fulfilment of the contract()caused us certain expenses.
A. had
B. have
C. has
D. having
查看答案&解析
查看所有试题
学习资料:
[单选题]The not ice given by the shipper after the shipment of the goods is called().
A. shipping notice
B. shipping instruction
C. shipping advice
D. shipping documents
[单选题]Everyone knows that China’s Bristles are of superior quality()those from other countries.
A. with
B. to
C. for
D. than
[单选题]An exporter cannot receive payment until the goods on consignment()sometime in the future.
A. have offered for sale
B. are quoted
C. arrive at destination
D. have been sold
[单选题]()we would like to assist you,we do not think there is room for a reduction in our price.
A. Even
B. As
C. Much
D. Muchas
[单选题]Concerning the E.U.,which of the following statements is wrong?()
A. A college student in Greece can get a job in the U.K.in summer vocation.
B. All the member countries adopt the currency,euro.
C. The executive body of the E.U. is the European Commission,headquartered in Brussels.
D. The Council of Ministers has the final power to decide E.U.actions.
[单选题](),there was no hope of her getting the order.
A. As she was exhausted
B. If she was exhausted
C. Exhausted though she was
D. Now that she was exhausted
本文链接:https://www.51bdks.net/show/y5w5e6.html