必典考网

After the order “()” is given, the air system is shut down

  • 下载次数:
  • 支持语言:
  • 790
  • 中文简体
  • 文件类型:
  • 支持平台:
  • pdf文档
  • PC/手机
  • 【名词&注释】

    工作量(workload)

  • [单选题]After the order “()” is given, the air system is shut down, the turning gear put in.

  • A. Finished with Engine
    B. Stop the Engine
    C. Stand-by Engine
    D. Slow-down Engine

  • 查看答案&解析 查看所有试题
  • 学习资料:
  • [单选题]航行中船舶推进系统发生故障,为了准确地确定修理范围、修理项目、修理方案及其工作量,修理前必须进行()。
  • A. 拆卸
    B. 各种检验
    C. 各种测量
    D. 零件无损探伤

  • [单选题]After ensuring that the () is correct the bearing clearance should be checked.
  • A. nap
    B. gap
    C. nip
    D. deflectio

  • [单选题]High-speed rotating in a centrifugal purifier can produce a force () larger than the force of gravity.
  • A. many thousand times
    B. between times
    C. one time
    D. at time

  • [单选题]If your propeller is racing in rough weather,you should().
  • A. decrease your engine speed
    B. ignore it
    C. increase your engine speed
    D. stop your engine until the rough weather passe

  • 本文链接:https://www.51bdks.net/show/wrxow5.html
  • 推荐阅读

    @2019-2025 必典考网 www.51bdks.net 蜀ICP备2021000628号 川公网安备 51012202001360号