  • [单选题]Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

  • A. A

  • 查看答案&解析 查看所有试题
  • 学习资料:
  • [单选题]Project()Management is the Knowledge Area that employs the processes required to ensure timely and appropriate generation, collection, distribution, storage,retrieval, and ultimate disposition ofproject information.
  • A. Integration
    B. Time
    C. Planning
    D. Communication

  • [单选题]Define Activities is the process ofidentifying the specific actions to be performed toproduce the()
  • A. projectelements
    B. work drafts
    C. workpackage
    D. projectdeliverables

  • [单选题]Configuration management system can be used in defining approval levels for authorizing changes and providing a method to validate approved changes.()is not a project configuration management tool.
  • A. RationalClearcase
    B. QualityFunctionDeployment
    C. VisualSourceSafe
    D. ConcurrentVersions System

  • [单选题]Creating WBS means subdividing the major project deliverables into smaller components until the deliverables are defined to the level()
  • A. independentresource
    B. individualworkload
    C. workmilestone
    D. workpackage

  • [单选题](1) is a method of constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the dependencies.This method includes following types of dependencies or precedence relationships: (2) the initiation of the successor activity, depends upon the completion ofthe predecessor activity.(3) the initiation ofthe successor activity, depends upon the initiation ofthe predecessor activity.
  • A. A