[单选题]Project Quality Management processes include all the activities of the()that determine quality policies, objectives and responsibilities so that the project will satisfy theneeds for which it was undertaken.
A. Project
B. project management team
C. performingorganization
D. customer
查看答案&解析
查看所有试题
学习资料:
[单选题]The()technique involves using project characteristics in a mathematical model to predict total project cost. Models can be simple or complex.
A. costaggregation
B. reserve analysis
C. parametricestimating
D. funding limit reconciliation
[单选题]()is a category assigned to products or services having the samefunctional use but different technical characteristics. Itisnotsameasquality.
A. Problem
B. Grade
C. Risk
D. Defect
[单选题]The()process analyzes the effect of risk events and assigns a numerical rating to those risks.
A. Riskldentification
B. Quantitative RiskAnalysis
C. Qualitative RiskAnalysis
D. Risk Monitoring and Control
[单选题]Project work packages are typically decomposed into smaller components called activities to provide a basis for()scheduling, executing, and monitoring and controllingthe proj ect work.
A. reviewing
B. estimating
C. auditing
D. expecting
[单选题]Creating WBS means subdividing the major project deliverables into smaller components until the deliverables are defined to the level()
A. independentresource
B. individualworkload
C. workmilestone
D. workpackage
[单选题]In which form of projects origination would the project manager be likely to exercise the most control over Project resources.()
A. Strongmatrix
B. Projectized
C. Projectcoordinator
D. Weakmatrix
[单选题](1) is a method of constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the dependencies.This method includes following types of dependencies or precedence relationships: (2) the initiation of the successor activity, depends upon the completion ofthe predecessor activity.(3) the initiation ofthe successor activity, depends upon the initiation ofthe predecessor activity.
A. A