  • 【名词&注释】

    关键词、相同之处(same places)、是什么(what is)、管理知识

  • [单选题]()is a category assigned to products or services having the samefunctional use but different technical characteristics. Itisnotsameasquality.

  • A. Problem
    B. Grade
    C. Risk
    D. Defect

  • 查看答案&解析 查看所有试题
  • 学习资料:
  • [单选题]PDM includes four types of dependencies or precedence relationships:().The completion ofthe successor activity depends upon the initiation of the predecessor activity.
  • A. Finish-to-Start
    B. Finish-to-Finish
    C. Start-to-Start
    D. Start-to-Finish

  • [单选题]Organizations perform work to achieve a set of objectives. Generally, work can be categorized as either projects or operations, although the two sometimes are()
  • A. confused
    B. same
    C. overlap
    D. dissever

  • [单选题]Define Activities is the process ofidentifying the specific actions to be performed toproduce the()
  • A. projectelements
    B. work drafts
    C. workpackage
    D. projectdeliverables

  • [单选题]The strategies for handling risk comprise of two main types: negative risks, and positive risks. The goal ofthe plan is to minimize threats and maximize opportunities. When dealing with negative risks, there are three main response strategies(),rransfer ,Mitigate.
  • A. Challenge
    B. Exploit
    C. Avoid
    D. Enhance

  • [单选题]The creation ofa work breakdown structure (WBS) is the process of()the major project deliverables.
  • A. subdividing
    B. assessing
    C. planning
    D. integrating

  • [单选题]The connection between two networks from an intemet is handled by a machine known as a()
  • A. bridge
    B. server
    C. router
    D. switch

  • [单选题](1) is a method of constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the dependencies.This method includes following types of dependencies or precedence relationships: (2) the initiation of the successor activity, depends upon the completion ofthe predecessor activity.(3) the initiation ofthe successor activity, depends upon the initiation ofthe predecessor activity.
  • A. D