必典考网

高级信息系统项目管理师题库2022专业英语题库高效提分每日一练(05月03日)

来源: 必典考网    发布:2022-05-03     [手机版]    
  • 下载次数:
  • 支持语言:
  • 1446次
  • 中文简体
  • 文件类型:
  • 支持平台:
  • pdf文档
  • PC/手机

导读

必典考网发布高级信息系统项目管理师题库2022专业英语题库高效提分每日一练(05月03日),更多专业英语题库的每日一练请访问必典考网高级信息系统项目管理师题库频道。

1. [单选题]()means that every project has a definite beginning and a definite end.

A. Projectphase
B. Unique
C. Temporary
D. Closure


2. [单选题]()is the budgeted amount for the work actually completed on the schedule activity or WBS component during a giving time period.

A. Plannedvalue
B. Earned value
C. Actualcost
D. Costvariance


3. [单选题]()is a category assigned to products or services having the samefunctional use but different technical characteristics. Itisnotsameasquality.

A. Problem
B. Grade
C. Risk
D. Defect


4. [单选题]()involves using mathematical techniques to forecast future outcomes based onhistorical results.

A. Trendanalysis
B. Qualityaudit
C. Defect repair review
D. Flowcharting


5. [单选题]Estimating schedule activity costs involves developing an (1) of the cost of theresources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additionalwork during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of (2) to facilitate comparisons both within and across projects.the (3) describes important information about project requirement that is considered during cost estimating.

A. C


  • 查看答案&解析 查看所有试题

  • 本文链接:https://www.51bdks.net/show/k4grvd.html

    @2019-2025 必典考网 www.51bdks.net 蜀ICP备2021000628号 川公网安备 51012202001360号