必典考网

Many of the activities performed during the preliminary inve

  • 下载次数:
  • 支持语言:
  • 1900
  • 中文简体
  • 文件类型:
  • 支持平台:
  • pdf文档
  • PC/手机
  • 【名词&注释】

    质量管理、基本原则(basic principle)、关键词、排除法(exclusive method)、过去分词(past participle)、项目组成员

  • [单选题]Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

  • A. C

  • 查看答案&解析 查看所有试题
  • 学习资料:
  • [单选题]Project()Management is the Knowledge Area that employs the processes required to ensure timely and appropriate generation, collection, distribution, storage,retrieval, and ultimate disposition ofproject information.
  • A. Integration
    B. Time
    C. Planning
    D. Communication

  • [单选题]The project team members should also be aware of one of the fundamental tenets of modern quality management: quality is planned, designed and built in, not()
  • A. executedin
    B. inspectedin
    C. check-in
    D. look-in

  • [单选题]Quality planning tools are often used to help plan effective quality management activities . ()is one of such tools, which involves company actual or planned project practices to those or other projects to generate ideas for improvement and to provide a basis by which to measure performance.
  • A. Benchmarking
    B. Quality metric
    C. Quality checklist
    D. Brainstornung

  • 本文链接:https://www.51bdks.net/show/9gn4xz.html
  • 推荐阅读

    @2019-2025 必典考网 www.51bdks.net 蜀ICP备2021000628号 川公网安备 51012202001360号