【导读】
必典考网发布高级信息系统项目管理师题库2022专业英语题库考试试题库(2R),更多专业英语题库的考试试题请访问必典考网高级信息系统项目管理师题库频道。
1. [单选题]In approximating costs, the estimator considers the possible causes ofvariation of the cost estimates, including()
A. budget
B. plan
C. risk
D. contract
2. [单选题]The receiving activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understanding is reached on the meaning of the requirements. The result ofthis analysis and dialog is an()set of requirements.
A. agreed-to
B. agree-to
C. agree-to-do
D. agree-with
3. [单选题]Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.
A. C