导读

必典考网发布专业英语题库年=免费每日一练下载(09月28日),更多专业英语题库的每日一练请访问必典考网高级信息系统项目管理师题库频道。

1. [单选题]Organizations perform work to achieve a set of objectives. Generally, work can be categorized as either projects or operations, although the two sometimes are()

A. confused
B. same
C. overlap
D. dissever


2. [单选题]During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised()are necessary.

A. proceedings
B. controls
C. forecastings
D. Prelibations


3. [单选题]The creation ofa work breakdown structure (WBS) is the process of()the major project deliverables.

A. subdividing
B. assessing
C. planning
D. integrating


4. [单选题]You are working on the cost budget for one project. Which of the following is true()

A. This process assigns cost estimates to project activities including risks and contingency plans.
B. The cost baseline will be used to measure variances and future project performance.
C. This process assigns cost estimates for expected future period operating costs.
D. The cost baseline is the expected cost for the project.


5. [单选题]Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

A. D


  • 查看答案&解析 查看所有试题