必典考网

专业英语题库2022试题试卷(8AA)

来源: 必典考网    发布:2022-10-05     [手机版]    
  • 下载次数:
  • 支持语言:
  • 207次
  • 中文简体
  • 文件类型:
  • 支持平台:
  • pdf文档
  • PC/手机

导读

必典考网发布专业英语题库2022试题试卷(8AA),更多专业英语题库的考试试题请访问必典考网高级信息系统项目管理师题库频道。

1. [单选题]Project()Management includes the processes required to ensure that theproj ect includes all the work required, and only the work required, to complete the project successfully.

A. Integration
B. Scope
C. Configuration
D. Requirement


2. [单选题]During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised()are necessary.

A. proceedings
B. controls
C. forecastings
D. Prelibations


3. [单选题]Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

A. A


  • 查看答案&解析 查看所有试题

  • 本文链接:https://www.51bdks.net/show/7rqzp7.html

    @2019-2025 必典考网 www.51bdks.net 蜀ICP备2021000628号 川公网安备 51012202001360号