必典考网

在抹灰工程施工前,必须对结构工程进行验收。

  • 下载次数:
  • 支持语言:
  • 1702
  • 中文简体
  • 文件类型:
  • 支持平台:
  • pdf文档
  • PC/手机
  • 【名词&注释】

    工程施工(engineering construction)、安全网(safety net)

  • [判断题]在抹灰工程施工前,必须对结构工程进行验收。

  • 查看答案&解析 查看所有试题
  • 学习资料:
  • [单选题]砂的质量要求是:颗粒坚硬、洁净,含泥量不超过()。
  • A. A.1%
    B. B.2%
    C. C.3%
    D. D.4%

  • [单选题]距离地面()米以上作业要有防护栏杆、拦板、安全网。
  • A. A.5
    B. B.4
    C. C.3
    D. D.2

  • [单选题]室外抹灰脚水板要满铺,最窄处不得超过()。
  • A. A.两块板子
    B. B.三块板子
    C. C.四块板子
    D. D.五块板子

  • [单选题]View the Exhibit and examine the properties of the TT tablespace. Using Database Control, you have scheduled a job to shrink the TRANS table residing on the TT tablespace. The job would run at 5:00 p.m. every Friday. When you examine the space usage of the table after the completion of the job, you find that the table has not been shrunk. What could have been the reason for this?()
  • A. The tablespace that contains the TRANS table is online.
    B. The tablespace that contains the TRANS table is permanent.
    C. The tablespace that contains the TRANS table is locally managed.
    D. The segment space management of the tablespace that contains the TRANS table is manual in nature.

  • 本文链接:https://www.51bdks.net/show/777rrp.html
  • 推荐阅读

    @2019-2025 必典考网 www.51bdks.net 蜀ICP备2021000628号 川公网安备 51012202001360号