【导读】
必典考网发布2022高级信息系统项目管理师题库专业英语题库考试试题下载(1P),更多专业英语题库的考试试题请访问必典考网高级信息系统项目管理师题库频道。
1. [单选题]The TCP protocolis a ()layer protocol.
A. physical
B. network
C. transport
D. application
2. [单选题]An example of scope verification is ().
A. review the performance ofan installed software module
B. managing changes to the project schedule
C. decomposing the WBS to a work package level
D. performing a benefit/cost analysis to determine if we should proceed with the project
3. [单选题]Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.
A. A