  • [单选题]Your project is behind schedule due to conflict between team members . Havingresolved the conflict, to get the project back on schedule , you should consider ().

  • A. crashing the schedule
    B. performing resource leveling
    C. conducting reverse resource allocation scheduling
    D. utilizing the critical chain resources

  • 查看答案&解析 查看所有试题
  • 学习资料:
  • [单选题]Project()Management includes the processes required to ensure that theproj ect includes all the work required, and only the work required, to complete the project successfully.
  • A. Integration
    B. Scope
    C. Configuration
    D. Requirement

  • [单选题]In approximating costs, the estimator considers the possible causes ofvariation of the cost estimates, including()
  • A. budget
    B. plan
    C. risk
    D. contract

  • [单选题]Estimating activity durations uses information on activity scope of(),required resource types, estimated resource quantities, and resource calendars.
  • A. milestone
    B. baseline
    C. quality
    D. work

  • [单选题]()is a property of object-oriented software by which an abstract operation may be performed in different ways in different classes.
  • A. Method
    B. Polymorphism
    C. Inheritance
    D. Encapsulation

  • [单选题]Project selection methods involve measuring value or attractiveness to the project owner or sponsor and may include other organizational decision criteria ()is not a project selection method.
  • A. Benefitcontribution
    B. Expertjudgment
    C. Scoringmodels
    D. Flowcharting

  • [单选题]The TCP protocolis a ()layer protocol.
  • A. physical
    B. network
    C. transport
    D. application

  • [单选题]Estimating schedule activity costs involves developing an (1) of the cost of theresources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in most application areas, additionalwork during a design phase is widely held to have the potential for reducing the cost of the execution phase and product operations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estimates are generally expressed in units of (2) to facilitate comparisons both within and across projects.the (3) describes important information about project requirement that is considered during cost estimating.
  • A. D

  • 本文链接:https://www.51bdks.net/show/5gn8qp.html
  • 推荐阅读

    @2019-2025 必典考网 www.51bdks.net 蜀ICP备2021000628号 川公网安备 51012202001360号