1. [单选题]The()defines the phases that connect the beginning of a project to its end.

A. schedule
B. project life cycle
C. temporary
D. milestone


2. [单选题]The()provides the project manager with the authority to apply organizational resources to project activities.

A. project management plan
B. contract
C. project human resource plan
D. projectcharter


3. [单选题]Organizations perform work to achieve a set of objectives. Generally, work can be categorized as either projects or operations, although the two sometimes are()

A. confused
B. same
C. overlap
D. dissever


4. [单选题]Project()Management is the Knowledge Area that employs the processes required to ensure timely and appropriate generation, collection, distribution, storage,retrieval, and ultimate disposition ofproject information.

A. Integration
B. Time
C. Planning
D. Communication


5. [单选题]The project()is a key input to quality planning since it documents major project deliverables, the project objectives that serve to define important stakeholder requirements,thresholds, and acceptance criteria.

A. work performance information
B. scope statement
C. changerequests
D. process analysis


6. [单选题]Define Activities is the process ofidentifying the specific actions to be performed toproduce the()

A. projectelements
B. work drafts
C. workpackage
D. projectdeliverables


7. [单选题]Configuration management system can be used in defining approval levels for authorizing changes and providing a method to validate approved changes.()is not a project configuration management tool.

A. RationalClearcase
B. QualityFunctionDeployment
C. VisualSourceSafe
D. ConcurrentVersions System


8. [单选题]Creating WBS means subdividing the major project deliverables into smaller components until the deliverables are defined to the level()

A. independentresource
B. individualworkload
C. workmilestone
D. workpackage


9. [单选题]The (1) is a general description of the architecture of a workflow management system used by the WFMC, in which the main components and the associated interfaces are summarized. The workflow enactment service is the heart of a workflow system which consists of several (2).

A. A


10. [单选题]Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

A. C