【名词&注释】
质量管理、关键词、逻辑关系(logical relation)、是什么(what is)、什么的
[单选题]The strategies for handling risk comprise of two main types: negative risks, and positive risks. The goal ofthe plan is to minimize threats and maximize opportunities. When dealing with negative risks, there are three main response strategies(),rransfer ,Mitigate.
A. Challenge
B. Exploit
C. Avoid
D. Enhance
查看答案&解析
查看所有试题
学习资料:
[单选题]The()describes, in detail, the project's deliverables and the work required to create those deliverables.
A. A
[单选题]Project Quality Management must address the management of the project and the()ofthe project. While Project Quality Management applies to all projects,regardless of the nature of their product, product quality measures and techniques are specific to the particular type of product produced by the project.
A. performance
B. process
C. product
D. object
[单选题]An example of scope verification is ().
A. review the performance ofan installed software module
B. managing changes to the project schedule
C. decomposing the WBS to a work package level
D. performing a benefit/cost analysis to determine if we should proceed with the project
[单选题]Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.
A. A
本文链接:https://www.51bdks.net/show/43qve9.html