An activity has an early start date-of the lOth and a late s

  • 下载次数:
  • 支持语言:
  • 1275
  • 中文简体
  • 文件类型:
  • 支持平台:
  • pdf文档
  • PC/手机
  • 【名词&注释】

    质量管理、工作流(workflow)、基本原则(basic principle)、关键词、排除法(exclusive method)、基本概念(basic concept)、过去分词(past participle)、项目组成员

  • [单选题]An activity has an early start date-of the lOth and a late start date of the 19th. The activity also has a duration of 4 days. There are no nonworkdays. From the information given, ()what can be concluded about the activity?

  • A. A

  • 查看答案&解析 查看所有试题
  • 学习资料:
  • [单选题]() is the process of obtaining the stakeholders' formal acceptance of the completed project scope .verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.
  • A. projectacceptance
    B. scopeverification
    C. scopedefinition
    D. WBS Creation

  • [单选题]The project team members should also be aware of one of the fundamental tenets of modern quality management: quality is planned, designed and built in, not()
  • A. executedin
    B. inspectedin
    C. check-in
    D. look-in

  • [单选题]Your project is behind schedule due to conflict between team members . Havingresolved the conflict, to get the project back on schedule , you should consider ().
  • A. crashing the schedule
    B. performing resource leveling
    C. conducting reverse resource allocation scheduling
    D. utilizing the critical chain resources

  • [单选题]The (1) is a general description of the architecture of a workflow management system used by the WFMC, in which the main components and the associated interfaces are summarized. The workflow enactment service is the heart of a workflow system which consists of several (2).