1. [单选题]The()describes, in detail, the project's deliverables and the work required to create those deliverables.

A. A


2. [单选题]The process of()schedule activity durations uses information on schedule activityscope of work, required resource types, estimated resource quantities, and resource calendarswith resource availabilities.

A. estimating
B. defining
C. planning
D. sequencing


3. [单选题]() from one phase are usually reviewed for completeness and accuracy and approved before work starts on the next phase.

A. Process
B. Milestone
C. Work
D. Deliverables


4. [单选题]()is a category assigned to products or services having the samefunctional use but different technical characteristics. Itisnotsameasquality.

A. Problem
B. Grade
C. Risk
D. Defect


5. [单选题]Project work packages are typically decomposed into smaller components called activities to provide a basis for()scheduling, executing, and monitoring and controllingthe proj ect work.

A. reviewing
B. estimating
C. auditing
D. expecting


6. [单选题]Project selection methods involve measuring value or attractiveness to the project owner or sponsor and may include other organizational decision criteria ()is not a project selection method.

A. Benefitcontribution
B. Expertjudgment
C. Scoringmodels
D. Flowcharting


7. [单选题]There are strategies typically deal with threats or risk that may have negative impacts on project objectives if they occur, some other strategies are suggested to deal with risks with potentially positive impacts. ()is a risk response strategy that may be adopted for either threats or opportunities.

A. share
B. Mitigate
C. Transfer
D. Acceptance


8. [单选题]The (1) is a general description of the architecture of a workflow management system used by the WFMC, in which the main components and the associated interfaces are summarized. The workflow enactment service is the heart of a workflow system which consists of several (2).

A. B


9. [单选题]Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.

A. A


10. [单选题]Documentation of a software package is normally produced for two purposes. One is to explain the (1) ofthe software and describe how to use them. This is known as (2) because it is designed to be read by the user of the software. The other purpose of documentation is to describe the software's internal composition so that the system can be maintained later in its life cycle. Documentation ofthis type is known as ( 3 )