1. [单选题]The()technique involves using project characteristics in a mathematical model to predict total project cost. Models can be simple or complex.
A. costaggregation
B. reserve analysis
C. parametricestimating
D. funding limit reconciliation
2. [单选题]Define Activities is the process ofidentifying the specific actions to be performed toproduce the()
A. projectelements
B. work drafts
C. workpackage
D. projectdeliverables
3. [单选题]Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the (2) and must develop enough knowledge about the (3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.
A. A